Our team conducted an engine power verification on board a beam trawler, to ensure compliance with European and National rules. A propeller shaft power measurement was conducted, and the engine settings were set accordingly.
Upon completion of the sea trial, the engine settings were sealed to ensure ongoing compliance of the vessel. The entire process was witnessed by a surveyor of the Human Environment and Transport Inspectorate (Ministry of Infrastructure and Water Management).


